City of Lauderhill Sports Park
To address the improvements needed at this 12-acre active recreation park, the Miller Legg Team developed conceptual designs and final construction documents for the replacement of baseball field and cricket pitch natural grass with synthetic turf, football scoreboard replacement, playground surface and shading upgrades, as well as fitness trail and outdoor fitness equipment improvements. These improvements provided for greater flexibility in parks programming and overall safety. As part of these design efforts, Miller Legg provided civil engineering design, stormwater permitting, landscape architecture, irrigation design, construction specifications and bidding assistance services.
Related Projects
The City of Miami Morningside Park created an expanded and improved tennis facility at this 42-acre Park. The project included improvements to an existing seven (7) courts that had experienced degradation due to drainage and soil stabilization issues. A new court layout was developed to increase the facility to eight (8) lighted courts and a warm-up training wall amenity. Other tennis improvements included upgraded lighting, fencing ad shaded bench area.