City of Homestead Biscayne Everglades Greenway Trail
Among the services Miller Legg provided for this 3.2 mile, 12-foot-wide Biscayne Everglades Greenway shared-use trail project were landscape architectural, engineering, surveying and environmental services including preparation of Florida Department of Transportation approved construction documents, design of regulatory and wayfinding signs, pavement markings, safe pedestrian push button crossing and necessary drainage within the C-103 Canal right-of-way from East Mowry Drive to SW 137th Avenue in Homestead. Topographic and Subsurface Utility Engineering services were delivered. The scope included engineering design and permitting services for the shared-use trail, associated drainage, and roadway pedestrian crossings. The firm also carried out Preliminary Natural Resource and Protected Species Investigations.