Florida Atlantic University (FAU) Schmidt Family Complex
Miller Legg provided engineering, survey / SUE and irrigation design services for Florida Atlantic University’s (FAU) new Schmidt Family Complex on the Boca Raton campus.
The project consisted of the design and construction of a new state-of-the-art 166,000 SF facility for its academic and athletic program with a grand lobby and main street, athletic and academic learning center, weight and training room, coaches offices, two outdoor football practice fields with lighting and natural grass, and expansion of the ground floor at Parking Garage 3 which houses classroom and office space for the College of Business. Miller Legg provided boundary and topographic survey and subsurface utility engineering (SUE) location services, along with engineering design for utilities, pavement, signing and marking, drainage, ADA accessibility, irrigation, grading, redevelopment, road circulation solutions, tree inventory and arborist review. Permitting services were provided through the City of Boca Raton Utilities, the Palm Beach County Health Department, South Florida Water Management District (SFWMD), the Lake Worth Drainage District, and the FAU Building Department.
In addition, Miller Legg provided bidding assistance, construction administration and certification services. The construction contract administration services provided included project meetings, site visits to observe the quality and quantity of construction and preparing interval field observation reports, contractor pay application review, shop drawing, product data and sample review/approval, contract document RFI response, construction completion inspection for accuracy and completeness, record document preparation.
Awarded:
- FEFPA Winter 2021 Architecture Showcase, Award of Merit, 2021
- FEFPA Conference Architectural Showcase, First Place, University Category, 2019
Related Projects

The City of Miramar replaced the Civic Center and Child Care building with a new one-story 24,000 SF building to accommodate its police substation, storage, administrative and other law enforcement and public safety facilities, in addition to a surface parking lot for safety vehicles.
The new building was certified LEED Gold certification.

The City of Miami Morningside Park created an expanded and improved tennis facility at this 42-acre Park. The project included improvements to an existing seven (7) courts that had experienced degradation due to drainage and soil stabilization issues. A new court layout was developed to increase the facility to eight (8) lighted courts and a warm-up training wall amenity. Other tennis improvements included upgraded lighting, fencing ad shaded bench area.

Miller Legg provided a full suite of civil engineering services for the LEED Gold Miami-Dade College Medical Campus Center for Learning, Innovation and Simulation project. The Center is 132,470 SF, 5-story academic building and accompanying garage, with spaces to simulate a real-world hospital environment, mainly for the medical school’s nursing and physician assistant programs.

1212 Lincoln Road is a six-story mixed-use redevelopment project on Alton Road between Lincoln Road and 16th Street on Miami Beach. The project includes approximately 67,000 SF open marketplace, 26,000 SF retail space, 46,000 SF hotel space and a 300-space structured parking facility.

Miller Legg provided civil engineering, utility engineering, permitting, construction observation and verification of system testing services for the development of the 120,000 SF mixed use development in Miami Beach with Baptist Health as the anchor tenant. Alton Road is a FDOT corridor. Services include grading, paving, drainage, water and sewer systems, drainage design including a pressurized injection well system and injection pumping equipment, utility coordination and permitting.