Rollins College Strong Hall
Miller Legg provided surveying and civil engineering design, permitting, and construction administration services for the demolition and reconstruction of the Strong Hall student housing facility on the Rollins College campus in Winter Park. Project included water, sewer, drainage and stormwater infrastructure facilities. Site constraints and aesthetic concerns prevented necessary stormwater improvements from being provided at the Strong Hall site. As such, Miller Legg provided modifications to an adjacent existing parking lot which included the construction of an underground dry retention facility to offset the impacts of the Strong Hall project. This unique approach allowed the client to preserve existing courtyards and green space while meeting the applicable stormwater treatment criteria.
Permitting was coordinated through the City of Winter Park, the Florida Department of Environmental Protection and the St Johns River Water Management District.
Related Projects
The City of Miramar replaced the Civic Center and Child Care building with a new one-story 24,000 SF building to accommodate its police substation, storage, administrative and other law enforcement and public safety facilities, in addition to a surface parking lot for safety vehicles.
The new building was certified LEED Gold certification.
The City of Miami Morningside Park created an expanded and improved tennis facility at this 42-acre Park. The project included improvements to an existing seven (7) courts that had experienced degradation due to drainage and soil stabilization issues. A new court layout was developed to increase the facility to eight (8) lighted courts and a warm-up training wall amenity. Other tennis improvements included upgraded lighting, fencing ad shaded bench area.
Miller Legg provided a full suite of civil engineering services for the LEED Gold Miami-Dade College Medical Campus Center for Learning, Innovation and Simulation project. The Center is 132,470 SF, 5-story academic building and accompanying garage, with spaces to simulate a real-world hospital environment, mainly for the medical school’s nursing and physician assistant programs.
1212 Lincoln Road is a six-story mixed-use redevelopment project on Alton Road between Lincoln Road and 16th Street on Miami Beach. The project includes approximately 67,000 SF open marketplace, 26,000 SF retail space, 46,000 SF hotel space and a 300-space structured parking facility.
Miller Legg provided civil engineering, utility engineering, permitting, construction observation and verification of system testing services for the development of the 120,000 SF mixed use development in Miami Beach with Baptist Health as the anchor tenant. Alton Road is a FDOT corridor. Services include grading, paving, drainage, water and sewer systems, drainage design including a pressurized injection well system and injection pumping equipment, utility coordination and permitting.