Ryder Trauma Center Fortification
Among the services provided by Miller Legg in connection with the exterior fortification and new helipad of this Jackson Memorial Hospital facility are landscape architectural inventory and analysis, conceptual and final design plans, planting design, tree permitting, paving and grading design, site civil design, stormwater and drainage, permitting, bid documents and construction observation, as well as topographic survey and subsurface utility engineering (SUE) services. The SUE work was performed to locate significant utility distribution corridors and medical underground utilities. This was critical to prevent utility damage during excavation and to provide design information.
Miller Legg was a subconsultant to Harvard Jolly, Inc.