United States Department of Veteran’s Affairs (VA) Sarasota National Cemetery
With nearly one fifth of Florida’s 1.9 million military-service veterans living within 75 miles of Sarasota, the U.S. Department of Veterans Affairs (VA) has designated a 300-acre site, comprised primarily of agricultural lands, to serve as the Sarasota National Cemetery. Miller Legg provided the necessary services for master planning and design development for this new National Cemetery. The firm also performed surveying, environmental site assessment, permitting, construction document preparation, construction period services, and the first year of compliance monitoring of the environmental mitigation areas. The design documentation for the Phase 1 build-out covered approximately 100 acres of the site.
Assembly Area Conceptual Approval Plan
Miller Legg was hired by The Patterson Foundation to design an expanded Assembly Area at the Sarasota National Cemetery. Typically, each National Cemetery has a space designated as the Assembly Area, a plaza space with a prominent American flag and a small paved area for public assembly. With The Patterson Foundation’s generous donation to the Veterans Administration, this new Assembly Area will be a lavish, formal gathering area to honor our veterans.
The design’s features include areas for art and interpretive history of the US military, a covered amphitheater with built in seating, and an expansive rostrum area for speaking.
The Miller Legg Team was responsible for guiding The Patterson Foundation through site analysis, preferences in materials selection, preparation of design concepts, and presentation to the Department of Veterans Affairs for conceptual design approval. The concept approved by the Department of Veterans Affairs was unveiled to the public at a ceremony at the Sarasota National Cemetery in July of 2011.
Related Projects
The City of Miramar replaced the Civic Center and Child Care building with a new one-story 24,000 SF building to accommodate its police substation, storage, administrative and other law enforcement and public safety facilities, in addition to a surface parking lot for safety vehicles.
The new building was certified LEED Gold certification.
The City of Miami Morningside Park created an expanded and improved tennis facility at this 42-acre Park. The project included improvements to an existing seven (7) courts that had experienced degradation due to drainage and soil stabilization issues. A new court layout was developed to increase the facility to eight (8) lighted courts and a warm-up training wall amenity. Other tennis improvements included upgraded lighting, fencing ad shaded bench area.
Miller Legg provided a full suite of civil engineering services for the LEED Gold Miami-Dade College Medical Campus Center for Learning, Innovation and Simulation project. The Center is 132,470 SF, 5-story academic building and accompanying garage, with spaces to simulate a real-world hospital environment, mainly for the medical school’s nursing and physician assistant programs.
1212 Lincoln Road is a six-story mixed-use redevelopment project on Alton Road between Lincoln Road and 16th Street on Miami Beach. The project includes approximately 67,000 SF open marketplace, 26,000 SF retail space, 46,000 SF hotel space and a 300-space structured parking facility.
Miller Legg provided civil engineering, utility engineering, permitting, construction observation and verification of system testing services for the development of the 120,000 SF mixed use development in Miami Beach with Baptist Health as the anchor tenant. Alton Road is a FDOT corridor. Services include grading, paving, drainage, water and sewer systems, drainage design including a pressurized injection well system and injection pumping equipment, utility coordination and permitting.