Town of Davie Trail Guides
One of the Town of Davie’s most important resources is its wealth of trails and natural history. In order to help residents to safely get away from the hectic pace of everyday life, the Town wanted to organize their trail system and interconnect their many parks. Miller Legg partnered our Geographic Information Systems (GIS) capability with the Town’s GIS Department to create two informative interactive Trail Guide Maps depicting pedestrian, horse, and other trails throughout the Town.
Differential GPS was used to map each trail in the field. One Trail Guide focused on eight equestrian trails, including park resources tailored for horseback riders. The other Trail Guide focused on ten trails and pathways for bicyclists and pedestrians. Both Trail Guides detailed photos and descriptions of elements along the way.
Related Projects
The City of Miramar replaced the Civic Center and Child Care building with a new one-story 24,000 SF building to accommodate its police substation, storage, administrative and other law enforcement and public safety facilities, in addition to a surface parking lot for safety vehicles.
The new building was certified LEED Gold certification.
The City of Miami Morningside Park created an expanded and improved tennis facility at this 42-acre Park. The project included improvements to an existing seven (7) courts that had experienced degradation due to drainage and soil stabilization issues. A new court layout was developed to increase the facility to eight (8) lighted courts and a warm-up training wall amenity. Other tennis improvements included upgraded lighting, fencing ad shaded bench area.
Miller Legg provided a full suite of civil engineering services for the LEED Gold Miami-Dade College Medical Campus Center for Learning, Innovation and Simulation project. The Center is 132,470 SF, 5-story academic building and accompanying garage, with spaces to simulate a real-world hospital environment, mainly for the medical school’s nursing and physician assistant programs.
1212 Lincoln Road is a six-story mixed-use redevelopment project on Alton Road between Lincoln Road and 16th Street on Miami Beach. The project includes approximately 67,000 SF open marketplace, 26,000 SF retail space, 46,000 SF hotel space and a 300-space structured parking facility.
Miller Legg provided civil engineering, utility engineering, permitting, construction observation and verification of system testing services for the development of the 120,000 SF mixed use development in Miami Beach with Baptist Health as the anchor tenant. Alton Road is a FDOT corridor. Services include grading, paving, drainage, water and sewer systems, drainage design including a pressurized injection well system and injection pumping equipment, utility coordination and permitting.