Florida International (FIU) Parking Garage 6
Miller Legg provided the engineering design services for Florida International University’s (FIU) 2,000-space 35,000 SF mixed-use Parking Garage No. 6 (PG6) on the Modesto Maidique campus in Miami. The design for this project included water, sewer, paving, grading, drainage, traffic and transportation design for this facility. Also the planning for a future express bus rapid transit hub is integrated into the site’s design. Off-site improvements include the widening of the campus loop road, NW 10th Street and the design of a two lane roundabout that will serve as the primary entrance to the campus.
Intersection improvements to SW 8th Street and SW 112th Avenue include coordination and permitting with FDOT for signalization and roadway improvements. The full scope of services includes: survey, subsurface utility engineering, design, permitting, construction observation and closeout for new and realigned spine roads with one additional roundabout (including a utility corridor of telecommunication duct banks, electrical duct banks, chilled water lines), sanitary sewer gravity mains, sanitary sewer force mains, drainage system, water mains, gas mains, and irrigation mains. Miller Legg was a subconsultant to PGAL.
This project was awarded the International Parking Institute’s Award of Excellence in Category II (Best Design of a Parking Facility with Fewer than 800 Spaces) in March 2016.
Awarded:
- International Parking Institute’s Award of Excellence in Category II
Related Projects
The City of Miramar replaced the Civic Center and Child Care building with a new one-story 24,000 SF building to accommodate its police substation, storage, administrative and other law enforcement and public safety facilities, in addition to a surface parking lot for safety vehicles.
The new building was certified LEED Gold certification.
The City of Miami Morningside Park created an expanded and improved tennis facility at this 42-acre Park. The project included improvements to an existing seven (7) courts that had experienced degradation due to drainage and soil stabilization issues. A new court layout was developed to increase the facility to eight (8) lighted courts and a warm-up training wall amenity. Other tennis improvements included upgraded lighting, fencing ad shaded bench area.
Miller Legg provided a full suite of civil engineering services for the LEED Gold Miami-Dade College Medical Campus Center for Learning, Innovation and Simulation project. The Center is 132,470 SF, 5-story academic building and accompanying garage, with spaces to simulate a real-world hospital environment, mainly for the medical school’s nursing and physician assistant programs.
1212 Lincoln Road is a six-story mixed-use redevelopment project on Alton Road between Lincoln Road and 16th Street on Miami Beach. The project includes approximately 67,000 SF open marketplace, 26,000 SF retail space, 46,000 SF hotel space and a 300-space structured parking facility.
Miller Legg provided civil engineering, utility engineering, permitting, construction observation and verification of system testing services for the development of the 120,000 SF mixed use development in Miami Beach with Baptist Health as the anchor tenant. Alton Road is a FDOT corridor. Services include grading, paving, drainage, water and sewer systems, drainage design including a pressurized injection well system and injection pumping equipment, utility coordination and permitting.